Blairland Baptist Church

2009 Construction Cost $987,331*
Cost per Square Foot $76.91
Area in Square Feet 12,837

Reference: Jeff Harris Cell: 865.458.5790

Scope of Services: Initial Master Plan of the site to determine maximum capacity of 3.11 acres of property for development.

Construction Documents for the implementation of the first phase including the site work. The first phase included a 6000 square foot multi-use room, 9 classrooms, future kitchen and support spaces.

Construction Administration during the building phase.

Interior Design Services.

* This figure is based on a bid submitted by George W. Reagan Co. This figure excludes kitchen equipment, furniture, site grading, site utilities, building permit fees, Architect & Engineer fees and sales tax. The price is based on the 2006 International Building Code which requires an outside air HVAC unit, sprinkler system and the structure designed to meet a 90 mph wind load.