East Maryville Baptist Church Phase I & II

1999 Construction Cost is $4,662,087*
Cost per Square Foot of $95.00
Area in Square Feet of 48,615

Reference: Mr. David Frahme Cell: 865.755.6485

Scope of Services: Initial Master Plan of the Site to determine maximum capacity of 26 acres of property for development. Included five phases of buildings and parking.

The Enhanced Master Plan including a Schematic Design of the completed five-phase facility; enabling the church in planning which phases to construct first and in prioritizing the use of the space in all phases.

Construction Documents for the implementation of the first two phases including the site work. The first two phases included a 1,000 seat sanctuary expandable to 1,500 seats, 29 classrooms, 7 offices, library and multi-purpose space.

Construction Administration for both phases one & two.

* This figure is based on a bid submitted by Johnson & Galyon. This figure excludes kitchen equipment, furniture, Architect & Engineer fees and sales tax. The design does not include a sprinkler system or outside air HVAC unit which is now required if the building was built today based on the 2006 International Building Code.