Trinity Baptist Church

2011 Construction Cost $339,368*
Area in Square Feet First Floor 1,322
Area in Square Feet Second Floor 1,025
Total Gross Feet 2,347

Reference: J. David Stooksbury Cell: 865.659.6282

Scope of Services: Schematic Design and Construction Documents for the implementation of a two story grand main entrance renovation. The design includes an elevator to allow access to the main worship center floor.

Interior Design Services for exterior color and finish selections.

* This figure is based on a bid submitted by George W. Reagan Co. Included in the figure is the site grading and site utilities. This figure excludes furniture, landscaping and parking, Architect & Engineer fees and sales tax.