West Park Baptist Church
Family Life Center

1998 Construction Cost $1,139,377*
Cost per Square Foot $59.00
Area in Square Feet 19,174

Reference: Sonny Evans Cell: 865.243.5753

Scope of Services: Schematic Design for proposed family life center addition to existing church building.

Construction Documents for the implementation of the two phases of the building including the site work. The drawings were organized to allow a single set of drawings to be used for both Phase I & II of the project. The building contains a 70' x 100' multi-purpose room with high school regulation basketball court, commercial kitchen, 11 classrooms, 2 large meeting rooms and 2 offices.

Construction Administration during the building phase.

* This figure is based on a bid submitted by George W. Reagan Co. This figure excludes kitchen equipment, furniture, Architect & Engineer fees and sales tax. Also excluded is the up-graded wood athletics floor and floor finishes. The design covered by this bid does not include a sprinkler system or outside air HVAC unit which is now required based on the 2006 International Building Code.